The tiling or flooring is defective
Uneven surfaces, irregular joints, delamination, a hollow sound underfoot. We measure the deviations and check the substrate and the method of laying.
Building expertise in Luxembourg
We compare what was actually done against what was agreed, and describe each defect precisely enough to demand it is put right.
A building defect is not a matter of taste. It is a gap between the finished work and what the quote, the plans, the product specifications and standard practice required. Until that gap is described in technical terms, a contractor can always claim the result is acceptable.
We record these gaps one by one: tolerances exceeded, non-compliant products, incorrect installation, a step skipped altogether. We state which standard was not met and what effect the defect will have on the durability of the work.
This level of precision makes all the difference in a dispute. A letter saying the work is poor achieves nothing. A report listing twenty non-conformities, with photographs and references, gets the work redone, or secures compensation.
Uneven surfaces, irregular joints, delamination, a hollow sound underfoot. We measure the deviations and check the substrate and the method of laying.
A terrace, a bathroom, a balcony, insufficient upstands. These defects prove very costly later, as they damage the surrounding work as well.
Panels poorly jointed, a punctured vapour barrier, thermal bridges left in place. We record the evidence before everything is closed up, while it is still possible.
Crazing, blistering, peeling within months of handover. We look for what, in the substrate or the application, explains the defect.
We establish the real state of progress, what remains to be done, and what will need to be demolished, before another contractor takes over.
Poor installation, missing sealant, adjustments never made, badly treated sills. These defects lead to infiltration and heat loss.
Every defect is named, located and measured. The contractor can no longer claim it is normal.
Some repairs are cosmetic, others require a complete redo. The report settles this often contested point.
We act within the time limits that matter, so that defects are reported in time, before your rights weaken.
Unsure about your building? Have it assessed.
Describe your situation in two minutes. We call you back and arrange the site visit.
01
We review the works carried out, the contractual documents and the state of your correspondence with the contractor.
02
We inspect the work concerned, with measurements and photographs, and we record every non-conformity, including ones you may not have noticed.
03
We compare our findings against the quote, the plans, the product specifications and the applicable standards of workmanship.
04
You receive the full list of defects, the repair expected for each one, and costings where you need them.
The report takes the form of a numbered schedule. For each point: location, photograph, description of the defect, the standard not met, and the repair expected.
This document can be sent as it stands to the contractor, its insurer, your solicitor or a court expert. It also serves as the basis for getting the repairs costed by another company.
We record building defects on sites of every size, right across Luxembourg.
Our visits cover Luxembourg City, Esch-sur-Alzette, Differdange, Dudelange, Ettelbruck, Diekirch, Mersch, Strassen, Bertrange and Mamer, as well as other municipalities across the country.
Luxembourg-Ville, Esch-sur-Alzette, Differdange, Dudelange, Ettelbruck, Diekirch, Mersch, Strassen, Bertrange, Mamer.
A defect exceeds accepted tolerances or departs from standard practice. An imperfection that stays within tolerance is not a defect, even if you find it unsatisfactory.
As quickly as possible. Some visible defects must be flagged at the point of handover, while others fall under warranties whose time limits start running from that date.
That is a legal question, best confirmed with a solicitor. From a technical standpoint, our report establishes the reality and scale of the defects, which supports that discussion over the balance due.
In a dispute, yes. Findings made with the contractor present are much harder to challenge afterwards.
Yes, when the case calls for it. We break the costs down by item so the total can be checked line by line.
We document the state of the works, what can still be used and what needs redoing. This is useful for the insurer, for the liquidation process, and for bringing in another contractor to finish the job.
List the defects you have noticed. We come and document them with the precision needed to demand they are put right.