Checks before works are covered over
Insulation, vapour barriers, waterproofing, buried services, reinforcement. Once these are covered, the only way to check them again is to open the wall or floor back up.
Building expertise in Luxembourg
We follow your build or renovation from the inspection of hidden works through to the closing of every snag on the list.
A building project turns on a handful of decisive moments. Checking the works before they are covered over. Confirming that the materials actually delivered match what was specified. The handover, where the written snag list decides what the contractor still has to fix. And the closing of that list, which is too often rushed through.
Our construction surveys focus on exactly these moments. We do not replace the architect or the engineering office. We bring an independent, quality-focused eye that protects your interests as the client throughout the build.
We work with private clients building a house, with co-owner associations carrying out major renovation work, and with companies running a project without an in-house technical team. Every deliverable is written, illustrated with photographs, and ready to use directly in your dealings with contractors.
Insulation, vapour barriers, waterproofing, buried services, reinforcement. Once these are covered, the only way to check them again is to open the wall or floor back up.
We draw up the snag list with you, in precise technical language, and we make sure the handover report genuinely reflects what was found on site.
The contractor says the fixes are done. We go back and check, item by item, what has actually been corrected.
We record the defect, link it to the relevant part of the building, and formally notify it within the applicable time limits.
We establish the exact state of progress and the quality of the work already carried out before a new contractor takes over.
Wrong thicknesses, positions, heights, substituted materials. We record the discrepancies and their real technical consequences.
A check during construction avoids destructive rework later, which is always the most expensive and the most contentious.
We verify that what was sold matches what is installed, including any product substituted during the works.
Every visit leaves a dated, photographic report behind. This body of evidence proves decisive if a dispute arises later.
Unsure about your building? Have it assessed.
Describe your situation in two minutes. We call you back and arrange the site visit.
01
We review the project, the parties involved and the schedule, then identify the visits that will genuinely add value.
02
We attend at the key stages, note any non-conformities and systematically photograph the works inspected.
03
We compare what was built against the drawings, the specification, the technical data sheets and the applicable standards.
04
After each visit, you receive a report listing the points to be corrected and the contractor responsible.
Our visit reports are short and practical: one point per non-conformity, a photograph, the contractor responsible, and the correction expected. You can send them straight on.
At the end of the project, a summary report brings together the snags, the fixes obtained and anything still outstanding. This is the document that protects your rights during the warranty period.
We monitor building sites across the whole of Luxembourg, from single family homes to apartment blocks.
We regularly visit Luxembourg City, Esch-sur-Alzette, Differdange, Dudelange, Ettelbruck, Diekirch, Mersch, Strassen, Bertrange and Mamer.
Luxembourg-Ville, Esch-sur-Alzette, Differdange, Dudelange, Ettelbruck, Diekirch, Mersch, Strassen, Bertrange, Mamer.
For a single house, three to five well-timed visits usually cover the essentials: structural work, hidden works, before finishes, and handover. A more complex project needs more.
No. The architect designs the project and directs the works. We provide an independent quality check on execution, working solely in your interest as the client.
Yes, that is a common request. We support you on the day and draft the snags to be recorded in the handover report.
As the client, you are entitled to bring the technical advisor of your choice. A refusal is in itself a warning sign worth taking seriously.
They are dated, illustrated records of fact. Shared with contractors as the project progresses, they carry real weight if a dispute follows later.
Yes, and it is a high-risk area because existing structures often hold surprises. Monitoring during the works is even more valuable there than on a new build.
Tell us about the works and the schedule. We will propose the site visits that will genuinely make a difference.
AC Expertises — Arap CETIN, Expert en bâtiment
21 rue du puits romain (Bâtiment Colors Business Center), L-8070 Bertrange